The five stages of every JBA piece — mold, pour, cure, finish, set. The same five, every time, no shortcuts.
- Pre-pour
- ~2 wk
- Build cycle
- 6–8 wk
- Set window
- 1 wk
Mold + drawing approval
Pour through finish
After delivery
01
Mold
Wk 1–2
We pull from our 300+ profile library or cut a custom mold. Bryan reviews the drawing and signs off before any concrete moves.
- Library pull or custom build
- Drawing review
- Reinforcement spec
- Sample casting if custom
02
Pour
Wk 3
Architectural mix, vibrated, screeded. Pieces poured in sequence, marked, and moved to cure.
- 5,000 PSI architectural
- Vibrated + screeded
- Reinforcement set
- Marked for cure
03
Cure
Wk 3–7
28 days for architectural · 14 for coping. We cure in shaded racks, controlled humidity. The right number of days, every time.
- 28-day architectural
- 14-day coping
- Shaded racks
- No rushing for schedule
04
Finish
Wk 7
Edged, sealed, and color-matched on the lot. Hand-finished where it shows. Sealed for SWFL weather.
- Edge dressing
- Color matched on lot
- Penetrating sealer
- Hand-finished detail
05
Set
Wk 8
Delivered tagged for your mason — or set on the lot by our crew. Either way, accountable.
- Tagged for placement
- Optional set crew
- Coordination with GC
- Punch within 14 days